ELECTRICAL 100 Summer ST
Sector: Power Generation (CCGT) • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Disconnect existing RTU and refeed from existing power source. Add (1) new 90 AMP feeder for new AHU located in loading dock mechanical room. Relocate (2) lights and (2) duct smoke detectors (separate BFD permit will be pulled for duct smokes) Reuse existing 60-AMP circuit to feed new fan VFD
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 100 Summer ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Disconnect existing RTU and refeed from existing power source. Add (1) new 90 AMP feeder for new AHU located in loading dock mechanical room. Relocate (2) lights and (2) duct smoke detectors (separate BFD permit will be pulled for duct smokes) Reuse existing 60-AMP circuit to feed new fan VFD |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
