ELECTRICAL 1001 Commonwealth AV
Sector: Car parking • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Damaged conductors required new conductors to be installed. From Existing handhole in sidewalk in front of 1010 Commonwealth Ave. ,install new conductors between HH and Eversource MH. Make connections to existing light pole at Extenet handhole
- Status
- Prospective
- Sector
- Car parking, Commercial, Government, Automotive
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 1001 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Damaged conductors required new conductors to be installed. From Existing handhole in sidewalk in front of 1010 Commonwealth Ave. ,install new conductors between HH and Eversource MH. Make connections to existing light pole at Extenet handhole |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
