ELECTRICAL 125-131 Park DR
Open · Massachusetts
Source: City of Boston
Install conduit and wiring for new city light pole, with pole top antenna, in the sidewalk in front of 125 Park Drive. Install distribution panel in pole base with 2 -20 Amp circuits to power antenna radio equipment and new pole light fixture. Extenet Node BBX-108
- Status
- Prospective
- Sector
- Power Generation (CCGT), Car parking, Commercial, Government, Automotive
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 125-131 Park DR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install conduit and wiring for new city light pole, with pole top antenna, in the sidewalk in front of 125 Park Drive. Install distribution panel in pole base with 2 -20 Amp circuits to power antenna radio equipment and new pole light fixture. Extenet Node BBX-108 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Commercial, Government, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
