logo
ProjectOpenBP

ELECTRICAL 15 Packard AVE

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Install 100A subpanel in attic addition. Provide branch circuits for recessed lights, switches, receptacles, 1 outdoor receptacle, outdoor lighting, and 1 A/C condenser unit. No ESS, EV charger, lift, or automated system included.

Status
Prospective
Sector
Electric Vehicles (EVs), Automotive, Commercial, Government
Location
Dorchester, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 15 Packard AVE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 15 Packard AVE” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Dorchester, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Install 100A subpanel in attic addition. Provide branch circuits for recessed lights, switches, receptacles, 1 outdoor receptacle, outdoor lighting, and 1 A/C condenser unit. No ESS, EV charger, lift, or automated system included.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Dorchester

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Automotive, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project