ELECTRICAL 20 Glenarm ST
Open · Massachusetts
Source: City of Boston
Unit 1 panel breaker refresh and upgrade and replace water bond. Replace the breakers that were exposed to water from a busted pipe, the panel does not require replacement as the exposure was limited. We will also replace the water bond at the water meter as it is not installed to code.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 20 Glenarm ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Unit 1 panel breaker refresh and upgrade and replace water bond. Replace the breakers that were exposed to water from a busted pipe, the panel does not require replacement as the exposure was limited. We will also replace the water bond at the water meter as it is not installed to code. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
