logo
ProjectOpenBP

ELECTRICAL 200 State ST

Open · Massachusetts

Source: City of Boston

Installations for power, switching, lighting and equipment both new and existing. Relocation of all existing circuits from existing Service on Floor that will be kept in place and wired to new power panels. Installation of Exit Signs, Emergency Light Units, Occupancy Sensors, graphic Controllers and or Control System, wiring of One (1)new Meter to existing Four Hundred (400) Amp 480 Volt Service.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 200 State ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 200 State ST” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Installations for power, switching, lighting and equipment both new and existing. Relocation of all existing circuits from existing Service on Floor that will be kept in place and wired to new power panels. Installation of Exit Signs, Emergency Light Units, Occupancy Sensors, graphic Controllers and or Control System, wiring of One (1)new Meter to existing Four Hundred (400) Amp 480 Volt Service. Allow up to a 110 Foot Feed into a Conduit from Ground floor Electric Room, Install new 400 Amp Current Transformer Cabinet with Transformer Mounts and Meter wiring as required for Power Company, mounted in Ground Floor Electric Room. Said Service to include One (1) Four Hundred (400) Amp 277/480 Volt Main Distribution Panel with allowance for Breakers to Govern Equipment. Install One (1) 112.5 KVA Transformer 480V to 120/208V and necessary Grounding and Wiring Interconnections to equipment. Install One (1) Four Hundred (400) Amp Main Breaker 120/208V Double Tub Panel Board with up to Eighty Poles of Breakers to govern equipment installations for power, lighting and equipment both new and existing. Re-Install existing One (1) 100 Hundred (100) Amp Main Lug 120/208V Panel board with up to Forty Poles of Breakers to govern equipment Wire 1 Roof Top Condenser Section @ 100 Amps for Multiple Evaporators, Wire 1 Roof Condenser Section @ 15 Amps for Transition Room at 480V, Wire Heat Pump #1 on Roof @ 30 Amps for Reception at 480 Volt, Wire Heat Pump #2 on Roof @ 45 Amps for Bathroom at 208 Volt, Wire Two (2) Circuits for Evaporator Unit #1 Transition Room at 208 Volt, Wire Two (2) Circuits for each Evaporator Unit Evaporator Unit #2 thru 7 Bar & Lounge at 208 Volt Wire Pumps for HVAC Equipment , Make Power Connects for all controls, Wire and install Controls provided by HVAC Contractor (Programming by HVAC Contractor), Rewire of existing Chiller via VFD (Supplied by Others) to New 400 Amp Service and Rewire of HVAC VAV Units remaining to New 400 Amp Service!

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project