ELECTRICAL 200 State ST
Open · Massachusetts
Source: City of Boston
Installations for power, switching, lighting and equipment both new and existing. Relocation of all existing circuits from existing Service on Floor that will be kept in place and wired to new power panels. Installation of Exit Signs, Emergency Light Units, Occupancy Sensors, graphic Controllers and or Control System, wiring of One (1)new Meter to existing Four Hundred (400) Amp 480 Volt Service.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 200 State ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installations for power, switching, lighting and equipment both new and existing. Relocation of all existing circuits from existing Service on Floor that will be kept in place and wired to new power panels. Installation of Exit Signs, Emergency Light Units, Occupancy Sensors, graphic Controllers and or Control System, wiring of One (1)new Meter to existing Four Hundred (400) Amp 480 Volt Service. Allow up to a 110 Foot Feed into a Conduit from Ground floor Electric Room, Install new 400 Amp Current Transformer Cabinet with Transformer Mounts and Meter wiring as required for Power Company, mounted in Ground Floor Electric Room. Said Service to include One (1) Four Hundred (400) Amp 277/480 Volt Main Distribution Panel with allowance for Breakers to Govern Equipment. Install One (1) 112.5 KVA Transformer 480V to 120/208V and necessary Grounding and Wiring Interconnections to equipment. Install One (1) Four Hundred (400) Amp Main Breaker 120/208V Double Tub Panel Board with up to Eighty Poles of Breakers to govern equipment installations for power, lighting and equipment both new and existing. Re-Install existing One (1) 100 Hundred (100) Amp Main Lug 120/208V Panel board with up to Forty Poles of Breakers to govern equipment Wire 1 Roof Top Condenser Section @ 100 Amps for Multiple Evaporators, Wire 1 Roof Condenser Section @ 15 Amps for Transition Room at 480V, Wire Heat Pump #1 on Roof @ 30 Amps for Reception at 480 Volt, Wire Heat Pump #2 on Roof @ 45 Amps for Bathroom at 208 Volt, Wire Two (2) Circuits for Evaporator Unit #1 Transition Room at 208 Volt, Wire Two (2) Circuits for each Evaporator Unit Evaporator Unit #2 thru 7 Bar & Lounge at 208 Volt Wire Pumps for HVAC Equipment , Make Power Connects for all controls, Wire and install Controls provided by HVAC Contractor (Programming by HVAC Contractor), Rewire of existing Chiller via VFD (Supplied by Others) to New 400 Amp Service and Rewire of HVAC VAV Units remaining to New 400 Amp Service! |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
