ELECTRICAL 222 Berkeley ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Add a new Siemens Control panel. Provide 120 VAC power. Wire an IP connection to the switch in the riser. wire the typical AHU control points to this new controller. Wire all control points to the existing Siemens controller (installed as part of the TI) 4th, 8th,9th floors, AHU-9,7,10,16. SIEM522
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 222 Berkeley ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Add a new Siemens Control panel. Provide 120 VAC power. Wire an IP connection to the switch in the riser. wire the typical AHU control points to this new controller. Wire all control points to the existing Siemens controller (installed as part of the TI) 4th, 8th,9th floors, AHU-9,7,10,16. SIEM522 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
