ELECTRICAL 235 Baker ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Install 120V / 5 Amp Feed from building to new scoreboard location -Includes 30A disconnect @ scoreboard; Install (2) 120V / 16 Amp Feeds from building to backstop press box - One for power, one for lighting; Utilize existing breakers in panel
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 235 Baker ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install 120V / 5 Amp Feed from building to new scoreboard location -Includes 30A disconnect @ scoreboard; Install (2) 120V / 16 Amp Feeds from building to backstop press box - One for power, one for lighting; Utilize existing breakers in panel |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
