ELECTRICAL 235 Harvard AV
Sector: Commercial • Location: Allston, Massachusetts, United States of America
Source: City of Boston
look over existing wiring and make sure it is up to the mass and national code. any wiring that is not up to code must be removed and replaced. also make sur smoke detectors are in the proper locations. and all areas are coverd with arc fault circuit breakers and have tamper proof outlets. to remedy
V150874
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 235 Harvard AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | look over existing wiring and make sure it is up to the mass and national code. any wiring that is not up to code must be removed and replaced. also make sur smoke detectors are in the proper locations. and all areas are coverd with arc fault circuit breakers and have tamper proof outlets. to remedy V150874 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
