ELECTRICAL 25-29 Beach ST
Sector: Power Generation (CCGT) • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Make safe - Disconnect all power to old wiring system. Power only main 400A panel, 2 new 100A panel in basement. Run temporary power for fire alarm system Run temporary light with switch at front door Run 14 circuits for temporary outlets
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 25-29 Beach ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Make safe - Disconnect all power to old wiring system. Power only main 400A panel, 2 new 100A panel in basement. Run temporary power for fire alarm system Run temporary light with switch at front door Run 14 circuits for temporary outlets |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
