logo
ProjectOpenBP

ELECTRICAL 25-29 Custer ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

removal of two existing 12 circuit FPE sub-panels in 2nd floor condo unit # 201 . Installation of two new 60 amp 20 circuit & 12 circuit sub-panels in condo unit . condo units main Disconnect is located in meter room . NSTAR meter re-seal not required .

Status
Prospective
Sector
Commercial, Government
Location
Jamaica Plain, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 25-29 Custer ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 25-29 Custer ST” is an infrastructure initiative in the Commercial sector, located in Jamaica Plain, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

removal of two existing 12 circuit FPE sub-panels in 2nd floor condo unit # 201 . Installation of two new 60 amp 20 circuit & 12 circuit sub-panels in condo unit . condo units main Disconnect is located in meter room . NSTAR meter re-seal not required .

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Jamaica Plain

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project