logo
ProjectOpenBP

ELECTRICAL 300-310 Pier 4 BL

Sector: Power Generation (CCGT) • Location: Boston, Massachusetts, United States of America

Source: City of Boston

Living/Dining Room

  • Install owner supplied pendant in dining room at existing junction box location with associated diming switch
  • Relocate existing power and cable for new television location in living room
  • Relocate existing 3-gang and shade control below fire alarm annunciator in living room
  • Den
  • Relocate existing 2-gang switch bank in den at desired television location. Switching will be
Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 300-310 Pier 4 BL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 300-310 Pier 4 BL” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Living/Dining Room - Install owner supplied pendant in dining room at existing junction box location with associated diming switch - Relocate existing power and cable for new television location in living room - Relocate existing 3-gang and shade control below fire alarm annunciator in living room - Den - Relocate existing 2-gang switch bank in den at desired television location. Switching will be transferred to remote PICO switches on the outside of the room. TCG assumes existing outlet and cable will be staying in its current location - Install customer furnished pendant lighting - Master Bathroom - Wire and install customer furnished Paris Mirror in master bathroom at new vanity location with associated switching - Furnish and install power outlet with USB at vanity in master bathroom - Furnish and install heat mat roughly 8’ x 7’ with associated thermostat - Master Bedroom - Relocate junction box in master bedroom at MDF pendant buildout at new ceiling fan location - Install owner supplied ceiling fan in master bedroom with associated switching - Wire and install junction boxes for (2) sconce lights on either side of the bed with associated switching - Install (2) customer furnished sconce lights in master bedroom

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project