ELECTRICAL 320 Longwood AV
Sector: Commercial • Location: Boston, Massachusetts, United States of America
Source: City of Boston
AHU EN 920 Remove 120 volt pipe and wire as well as control pipe to allow for new heating and cooling coil. Reinstall after new coils are installed. provide 120 volt circuit for UV lights. New CHW valve and Heating valve and face and Bypass Dampers. ENE456X
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 320 Longwood AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | AHU EN 920 Remove 120 volt pipe and wire as well as control pipe to allow for new heating and cooling coil. Reinstall after new coils are installed. provide 120 volt circuit for UV lights. New CHW valve and Heating valve and face and Bypass Dampers. ENE456X |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
