logo
ProjectOpenBP

ELECTRICAL 350 Washington ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

To install new 60amp/240V single phase service for new Verizon micro cell site in parking garage. Power conduit will be approx. 400ft. of 1-1/2" emt with all emt compression fittings. Commercial meter will be installed on 6th floor electrical room fed from a 100amp/480V fused bus duct disconnect. A 480V to 240V transformer will be fed from meter and a disconnect will be installed. The site locat

Status
Prospective
Sector
Power Generation (CCGT), Car parking, Commercial, Government, Automotive
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 350 Washington ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 350 Washington ST” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

To install new 60amp/240V single phase service for new Verizon micro cell site in parking garage. Power conduit will be approx. 400ft. of 1-1/2" emt with all emt compression fittings. Commercial meter will be installed on 6th floor electrical room fed from a 100amp/480V fused bus duct disconnect. A 480V to 240V transformer will be fed from meter and a disconnect will be installed. The site location will have a 60amp power panel for 1 receptacle and 2 branch circuits.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Car parking, Commercial, Government, Automotive

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project