ELECTRICAL 380 Boylston ST
Open · Massachusetts
Source: City of Boston
Meg out all circuits to re activate after water damage to the area. Install power and lights to lower area for servpro to run fans and dehumidifiers. Remove circuits from breakers in areas that need to be repaired or replace in future.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 380 Boylston ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Meg out all circuits to re activate after water damage to the area. Install power and lights to lower area for servpro to run fans and dehumidifiers. Remove circuits from breakers in areas that need to be repaired or replace in future. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
