ELECTRICAL 4-16 River ST
Sector: Power Generation (CCGT) • Location: Mattapan, Massachusetts, United States of America
Source: City of Boston
Electrical Installation for the Drive Up and Go equipment in the Lower Mills location ? (1) 3-door refrigerated freezer ? (1) 3-door refrigerated cooler ? (1) Warming desk ? (1) Work Station with clean power and (8) Data drops ? (1) Sign circuit ? (1) Produce department scale
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Mattapan, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 4-16 River ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Electrical Installation for the Drive Up and Go equipment in the Lower Mills location ? (1) 3-door refrigerated freezer ? (1) 3-door refrigerated cooler ? (1) Warming desk ? (1) Work Station with clean power and (8) Data drops ? (1) Sign circuit ? (1) Produce department scale |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mattapan |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
