ELECTRICAL 420 Pond ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Install wiring for (72) wall lights with wall a switch for each. Install (8) 20amp circuits for (22) outlets at language lab. Install an additional outlet at language lab closet for internet server. Install (2) 20amp circuits and (2) outlets for treadmills at exercise room. Replace an existing 20amp circuit at adminstation buildings basement.
- Status
- Prospective
- Sector
- Broadband, Telecommunications, Commercial, Government
- Location
- Jamaica Plain, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 420 Pond ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install wiring for (72) wall lights with wall a switch for each. Install (8) 20amp circuits for (22) outlets at language lab. Install an additional outlet at language lab closet for internet server. Install (2) 20amp circuits and (2) outlets for treadmills at exercise room. Replace an existing 20amp circuit at adminstation buildings basement. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Jamaica Plain |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Broadband, Telecommunications, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
