logo
ProjectOpenBP

ELECTRICAL 498-528 Commonwealth AV

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Providing AT&;T with a 200 Amp Single Phase Sub Panel off of the New 480 Volt 50 KVA Transformer stepping down power to 120/240 Volt Single Phase. We will be piping and Wiring all of the AT&;T Equipment inside their lease area and also all of the Grounding.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Government
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about ELECTRICAL 498-528 Commonwealth AV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELECTRICAL 498-528 Commonwealth AV” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Providing AT&;T with a 200 Amp Single Phase Sub Panel off of the New 480 Volt 50 KVA Transformer stepping down power to 120/240 Volt Single Phase. We will be piping and Wiring all of the AT&;T Equipment inside their lease area and also all of the Grounding.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project