ELECTRICAL 5-7 Argus PL
Open · Massachusetts
Source: City of Boston
- All circuits altered, extended, and repaired will need to be brought to NEC2023 code requirements. Including tamper resistant devices, AFCI, and GFCI protection on all wiring.
- ??Furnish and install new lighting to replace existing
- ??Pull permit and meet with local inspector
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 5-7 Argus PL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | - All circuits altered, extended, and repaired will need to be brought to NEC2023 code requirements. Including tamper resistant devices, AFCI, and GFCI protection on all wiring. - ??Furnish and install new lighting to replace existing - ??Pull permit and meet with local inspector |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
