ELECTRICAL 50 Battery ST
Sector: Water Supply and Storage • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Disconnect branch circuits from unit electrical panel due to water damage. Activate unit electrical panel. Installed temporary lighting and power. Remove light fixtures in unit to prepare for demo.
- Status
- Prospective
- Sector
- Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 50 Battery ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Disconnect branch circuits from unit electrical panel due to water damage. Activate unit electrical panel. Installed temporary lighting and power. Remove light fixtures in unit to prepare for demo. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Energy Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
