ELECTRICAL 550 Huntington AVE
Sector: Manufacturing (Industrial) • Location: Mission Hill, Massachusetts, United States of America
Source: City of Boston
Installation of power for temporary classroom trailers at lawn area on Ruggles St. in front of Admin building. Providing two 220 amp single phase services to classroom trailers. Power to be taken from Main distribution Panel in basement of administration building.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Commercial, Government
- Location
- Mission Hill, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 550 Huntington AVE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installation of power for temporary classroom trailers at lawn area on Ruggles St. in front of Admin building. Providing two 220 amp single phase services to classroom trailers. Power to be taken from Main distribution Panel in basement of administration building. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mission Hill |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
