ELECTRICAL 571-573 E First ST
Open · Massachusetts
Source: City of Boston
Relocate wiring for existing gas fired heaters. Disconnect wiring for heaters to be removed. Install wiring for water pump system and hose reel system. Power for new ERV unit. Relocate power for the roof exhaust fan. Replace disconnect.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- South Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 571-573 E First ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Relocate wiring for existing gas fired heaters. Disconnect wiring for heaters to be removed. Install wiring for water pump system and hose reel system. Power for new ERV unit. Relocate power for the roof exhaust fan. Replace disconnect. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
