ELECTRICAL 58 S Waverly ST
Open · Massachusetts
Source: City of Boston
Replace existing 200-amp overhead service with 400-amp overhead service . Wire (2 )5 ton ac unit. Wire 50-amp hot tub. Wire 40-amp electric car charger. Wire 20 outlets in basement 20 recessed lights. 2 hot water boilers and 4 smokes 2 co detectors. 12 switches and 6 lighting luminaries
- Status
- Prospective
- Sector
- Water Supply and Storage, Electric Vehicles (EVs), Automotive, Commercial, Government, Manufacturing (Industrial)
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 58 S Waverly ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace existing 200-amp overhead service with 400-amp overhead service . Wire (2 )5 ton ac unit. Wire 50-amp hot tub. Wire 40-amp electric car charger. Wire 20 outlets in basement 20 recessed lights. 2 hot water boilers and 4 smokes 2 co detectors. 12 switches and 6 lighting luminaries |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Electric Vehicles (EVs), Automotive, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
