ELECTRICAL 74-84 Fairmount AV
Sector: Power Generation (CCGT) • Location: Hyde Park, Massachusetts, United States of America
Source: City of Boston
THIS WORK WILL BE DONE AT 82 FAIRMOUNT AVE remove and change one light in the center of the store. add two lights in the store front window on existing boxes and power add eight hanging lights piped and box from an existing box and switch in the store front
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government, Residential
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 74-84 Fairmount AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | THIS WORK WILL BE DONE AT 82 FAIRMOUNT AVE remove and change one light in the center of the store. add two lights in the store front window on existing boxes and power add eight hanging lights piped and box from an existing box and switch in the store front |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government, Residential |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
