ELECTRICAL 75 Francis ST
Open · Massachusetts
Source: City of Boston
Phased project in Bed Tower and Connors Building. Install new DDC control panels with UPS on each floor and extend network loops to designated areas on each floor for future use. Install new 120v circuit to power each panel.
HON213X
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 75 Francis ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Phased project in Bed Tower and Connors Building. Install new DDC control panels with UPS on each floor and extend network loops to designated areas on each floor for future use. Install new 120v circuit to power each panel. HON213X |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
