ELECTRICAL 76-78 N Margin ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Install (15) 4inch fire rated recessed fixtures. Rough in kitchen according to new layout. Adding ceiling fans in bedrooms. Adding 70CFM Nutone Bathroom Fan/light. Adding (7) dedicated circuits. Replacing 12 circuit main lug panel with a 30 circuit main lug panel to accommodate arc fault circuit breakers.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 76-78 N Margin ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Install (15) 4inch fire rated recessed fixtures. Rough in kitchen according to new layout. Adding ceiling fans in bedrooms. Adding 70CFM Nutone Bathroom Fan/light. Adding (7) dedicated circuits. Replacing 12 circuit main lug panel with a 30 circuit main lug panel to accommodate arc fault circuit breakers. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
