ELECTRICAL 78 E Brookline ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Water heater in first floor unit #2 leaked and damaged small area of unit #2. Also damaged basement unit #1 bathroom.
Electrical repairs in first floor unit #2 consist of: 1: Install new dedicated twenty amp line for laundry circuit. This circuit will be Arc Fault protected and GFI protected. With dead front GFI readily accessible. 2: Relocated 240volt dryer plug about 2ft. 3: Disconnect and reco
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 78 E Brookline ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Water heater in first floor unit #2 leaked and damaged small area of unit #2. Also damaged basement unit #1 bathroom. Electrical repairs in first floor unit #2 consist of: 1: Install new dedicated twenty amp line for laundry circuit. This circuit will be Arc Fault protected and GFI protected. With dead front GFI readily accessible. 2: Relocated 240volt dryer plug about 2ft. 3: Disconnect and reconnect 240volt water heater circuit. Electrical repairs in basement floor unit #1 consist of: 1: Remove and replace damaged 2' electric baseboard heater. 2: Remove and replace damaged electric wall thermostat. 3: Rewire completed bathroom, bathroom was completely gutted due to water damage. 4: Install a dedicated 20amp line for bathroom GFI plug. 5: Install a dedicated 20amp line for bathroom, fan/light/heat/night light. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
