ELECTRICAL 80 Blossom ST
Open · Massachusetts
Source: City of Boston
SM# 150125TUR - MGH Generator Enabling Project. Install lighting, power, panels Other: Gear: (1)200A ATS,(2)400A ATS,(2) 800A ATS, UPS 50KVA/50KW, (2)1600A 277/480 3P4W,(2)800A 277/480 3P4W, (2)400A 277/480 3P4W,(1)200A 277/480 3P4W,(1)100A 277/480 3P4W,(1)100A 120/208V 3P4W(2)60A 120/208V 3P4W
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 80 Blossom ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SM# 150125TUR - MGH Generator Enabling Project. Install lighting, power, panels Other: Gear: (1)200A ATS,(2)400A ATS,(2) 800A ATS, UPS 50KVA/50KW, (2)1600A 277/480 3P4W,(2)800A 277/480 3P4W, (2)400A 277/480 3P4W,(1)200A 277/480 3P4W,(1)100A 277/480 3P4W,(1)100A 120/208V 3P4W(2)60A 120/208V 3P4W |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
