ELECTRICAL 90 Commonwealth AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
- Demo and make safe existing electrical wires
- Install 2-30 space 100 amp distribution panels in the units mechanical room connected to two separate existing meters located in the buildings mechanical room
- Electrical installation inclusive of labor, wires, junction boxes, standard duplex receptacles and toggle switches
- Install control wiring and power wiring for 2 Carrier mini split outdoor
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about ELECTRICAL 90 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | - Demo and make safe existing electrical wires - Install 2-30 space 100 amp distribution panels in the units mechanical room connected to two separate existing meters located in the buildings mechanical room - Electrical installation inclusive of labor, wires, junction boxes, standard duplex receptacles and toggle switches - Install control wiring and power wiring for 2 Carrier mini split outdoor units at 30 amps overcurrent protection each, and 8 ducted heat pump. fan coils at 1.11 amps each. - Connect wiring to one distribution box and outdoor unit. - Provide GFCI receptacle within 25' of outdoor unit. - Install wiring for two thermostats connected one to each outdoor unit. - Laundry Heated Floor, heated floor system to be provided by the General Contractor/Owner - Master Bathroom Heated Floor, heated floor system to be provided by the General Contractor/Owner - Guest Bathroom Heated Floor, heated floor system to be provided by the General Contractor/Owner - Full Bath Heated Floor, heated floor system to be provided by the General Contractor/Owner - Includes up to 40 Branch Circuits, Including the kitchen appliances. - Installation of speaker wire (14/2 speaker wire) - Installation of 3 Gigabit UTP Cat 6 to media outlets and networking points. - Installation of all lighting fixtures < 15lbs, all lighting fixtures to be provided by owner. - Inspectional Services Fees - Rough inspection - Final Inspection |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
