logo
ProjectClosed

Electrical Power Distribution Loop Rehab Bid Package 2

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2 Description of Project: The 12kV Electrical Power Distribution Loop Rehabilitation Project includes six phases of work that are being planned and sequenced in the upcoming years to coordinate with other ongoing capital improvement projects at the Palo Alto Regional Water Quality Control Plant. This Bid Package 2 (IFB 192135) incl

Status
Closed
Sector
Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial
Location
Palo Alto, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Electrical Power Distribution Loop Rehab Bid Package 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electrical Power Distribution Loop Rehab Bid Package 2” is an infrastructure initiative in the Power Transmission sector, located in Palo Alto, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

12kV Electrical Power Distribution Loop Rehabilitation Bid Package 2 Description of Project: The 12kV Electrical Power Distribution Loop Rehabilitation Project includes six phases of work that are being planned and sequenced in the upcoming years to coordinate with other ongoing capital improvement projects at the Palo Alto Regional Water Quality Control Plant. This Bid Package 2 (IFB 192135) includes installation of a canopy structure over new Load Centers (LC-3 & -4), replacement of several...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Palo Alto

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Water Supply and Storage, Power Generation (CCGT), Government, Commercial

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project