logo
ProjectGc Bidding

Electrical Substation Manufacturing Facility

One of 10,000+ projects Taiyo tracks in Louisiana.

Source: Dodge

Base Bid: includes an 80,000 sq ft manufacturing facility with overhead bridge cranes and auger-cast pile foundations. Additive Alternate #1: includes a 25,000 sq ft storage building on shallow foundations with stone access drives

Status
Prospective
Sector
Steel, Bridge, Commercial, Manufacturing (Industrial), Power Generation (CCGT)
Location
Alexandria, Louisiana, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Electrical Substation Manufacturing Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electrical Substation Manufacturing Facility” is an infrastructure initiative in the Steel sector, located in Alexandria, Louisiana, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Base Bid: includes an 80,000 sq ft manufacturing facility with overhead bridge cranes and auger-cast pile foundations. Additive Alternate #1: includes a 25,000 sq ft storage building on shallow foundations with stone access drives

Procurement method

Budget

Location

Country

United States of America (USA)

State

Louisiana

City

Alexandria

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Steel, Bridge, Commercial, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project