Electrical Switchgear and Infrastructure Replacement
Sector: Power Generation (CCGT) • Location: Santa Barbara, California, United States of America
Source: Dodge
Contractor holding both an active B- (General Contractor) AND C-10 (Electrical Contractor) meeting all of the qualifications described herein to construct of theMEngineering II Switchgear Infrastructure. qualified by the University as described herein shall be invited to participate in a Best Value bid. The work involves replacement of the existing 480V/277V gear, 120V/208 gear, main switch, condu
- Status
- Closed
- Sector
- Power Generation (CCGT), Education, Commercial
- Location
- Santa Barbara, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Electrical Switchgear and Infrastructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor holding both an active B- (General Contractor) AND C-10 (Electrical Contractor) meeting all of the qualifications described herein to construct of theMEngineering II Switchgear Infrastructure. qualified by the University as described herein shall be invited to participate in a Best Value bid. The work involves replacement of the existing 480V/277V gear, 120V/208 gear, main switch, conductors, transformers and electrical equipment within the Engineering II Building roof penthouse. T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Barbara |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Education, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
