logo

Electrical Upgrade and Billing System Project

Sector: Water Supply and Storage • Location: Birmingham, Alabama, United States

Source: WVTM

Project
Cancelled

The utility canceled four major infrastructure projects, including a $25 million electrical upgrade to a water treatment plant and a new billing system.

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT)
Location
Birmingham, Alabama, United States of America
Updated
22 Jul 2026
Source
WVTM

ConstructChat

Ask ConstructChat about Electrical Upgrade and Billing System Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electrical Upgrade and Billing System Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Birmingham, Alabama, United States. Taiyo aggregates data on it from WVTM.

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The utility canceled four major infrastructure projects, including a $25 million electrical upgrade to a water treatment plant and a new billing system.

Original sector

Water Utility

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Birmingham

Source

Source

WVTM

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project