logo
ProjectCompleted

Electrical Upgrades at the Hanlan and Herridge Pumping Stations

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Infrastructure Canada

Design and construction of electrical upgrades at the Hanlan Pumping Station and design of electrical upgrades at the Herridge Pumping Station. An assessment was conducted by an electrical engineer in 2014 that identified the need to replace aging high voltage electrical installed in the 1970’s at both of the stations. The Hanlan Pumping Station provides water to the center and northeast portions

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Electrical Upgrades at the Hanlan and Herridge Pumping Stations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electrical Upgrades at the Hanlan and Herridge Pumping Stations” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design and construction of electrical upgrades at the Hanlan Pumping Station and design of electrical upgrades at the Herridge Pumping Station. An assessment was conducted by an electrical engineer in 2014 that identified the need to replace aging high voltage electrical installed in the 1970’s at both of the stations. The Hanlan Pumping Station provides water to the center and northeast portions of Mississauga and is a key facility that pumps water into Brampton. The Herridge Pumping Station provides water to the southwest portion or Mississauga and conveys water to northwest Mississauga and west Brampton.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project