logo

Electrical Vaults Relocation - Smart Ready Switchgear (Campus Wide) - Main Campus

Sector: Power Generation (CCGT) • Location: Turlock, California, United States of America

Source: California State University Stanislaus

Project
Pre-Construction

The Electrical Vaults relocation project includes removal of underground vaults, installation of protections and isolation capabilities as well as Supervisory Control and Data Acquisition (SCADA), an automation control system that can be used to automate the campus’ electrical power. SCADA will monitor and control the campus’ electric power transmission and distribution. A SCADA system sends signa

Project Information FAQ

Project Information

5 Q
The project “Electrical Vaults Relocation - Smart Ready Switchgear (Campus Wide) - Main Campus” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Turlock, California, United States of America. Taiyo aggregates data on it from California State University Stanislaus.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Electrical Vaults relocation project includes removal of underground vaults, installation of protections and isolation capabilities as well as Supervisory Control and Data Acquisition (SCADA), an automation control system that can be used to automate the campus’ electrical power. SCADA will monitor and control the campus’ electric power transmission and distribution. A SCADA system sends signals that allow the user to control remotely any equipment on the system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data