logo

Electricidade e Aguas de Guinea-Bissau

Sector: Water Supply and Storage • Location: Guinea-Bissau

Source: World Bank Group

Project
Concluded

In July 1991, a consortium consisting of Electricite de France (EdF) and Lyonnaise des Eaux (LYSA, later renamed Suez in March of 2001) signed a performance-based management contract with the government of Guinea-Bissau to operate and manage power generation, transmission, and distribution services as well as the water services run by Electricade e Aguas de Guinea-Bissau (EAGB), the state utility

Project Information FAQ

Project Information

4 Q
The project “Electricidade e Aguas de Guinea-Bissau” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea-Bissau. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In July 1991, a consortium consisting of Electricite de France (EdF) and Lyonnaise des Eaux (LYSA, later renamed Suez in March of 2001) signed a performance-based management contract with the government of Guinea-Bissau to operate and manage power generation, transmission, and distribution services as well as the water services run by Electricade e Aguas de Guinea-Bissau (EAGB), the state utility and asset holding company. The length of the contract was 2.5-years with a 2-year extension, at which point the contract was to be rebid. The contract specified that 75% of the remuneration was guaranteed, but that the remaining 25% was based on performance. EAGB had an installed capacity of 10.4-MW with an operational capacity estimated at 8.8-MW. This contract remained in effect until July 30, 1997, when it was concluded and the state, through EAGB, reassumed operational control of the utility. There were some improvements in the company's administration, maintenance and distribution, but the performance of EAGB under the contractual arrangement with EDF/LYSA was, on the whole, less than satisfactory. There was very little investment in the sectors over the five years of the contract. Production and distribution of both water and electricity remained far below demand and were of deteriorating quality. There were enormous losses in both sectors due to fraud and technical problems. The tariff adjustments were not coherent with inflation or the cost of fuel. The Government was in arrears in paying its bills to the utility. Weak commercial management combined with poor personnel management had only added to the problems of the utility. Poor quality services had exacerbated poor revenue collection systems, with the result that EAGB was undergoing a severe cash flow crisis.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data