logo

Electricidade e Aguas de Guinea-Bissau

Sector: Water Supply and Storage • Location: Guinea-Bissau

Source: World Bank Group

Project
Concluded

In July 1991, a consortium consisting of Electricite de France (EdF) and Lyonnaise des Eaux (LYSA, later renamed Suez in March of 2001) signed a performance-based management contract with the government of Guinea-Bissau to operate and manage power generation, transmission, and distribution services as well as the water services run by Electricade e Aguas de Guinea-Bissau (EAGB), the state utility

Status
Closed
Sector
Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Power Transmission
Location
Guinea-Bissau
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electricidade e Aguas de Guinea-Bissau

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electricidade e Aguas de Guinea-Bissau” is an infrastructure initiative in the Water Supply and Storage sector, located in Guinea-Bissau. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Concluded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 1991, a consortium consisting of Electricite de France (EdF) and Lyonnaise des Eaux (LYSA, later renamed Suez in March of 2001) signed a performance-based management contract with the government of Guinea-Bissau to operate and manage power generation, transmission, and distribution services as well as the water services run by Electricade e Aguas de Guinea-Bissau (EAGB), the state utility and asset holding company. The length of the contract was 2.5-years with a 2-year extension, at which point the contract was to be rebid. The contract specified that 75% of the remuneration was guaranteed, but that the remaining 25% was based on performance. EAGB had an installed capacity of 10.4-MW with an operational capacity estimated at 8.8-MW. This contract remained in effect until July 30, 1997, when it was concluded and the state, through EAGB, reassumed operational control of the utility. There were some improvements in the company's administration, maintenance and distribution, but the performance of EAGB under the contractual arrangement with EDF/LYSA was, on the whole, less than satisfactory. There was very little investment in the sectors over the five years of the contract. Production and distribution of both water and electricity remained far below demand and were of deteriorating quality. There were enormous losses in both sectors due to fraud and technical problems. The tariff adjustments were not coherent with inflation or the cost of fuel. The Government was in arrears in paying its bills to the utility. Weak commercial management combined with poor personnel management had only added to the problems of the utility. Poor quality services had exacerbated poor revenue collection systems, with the result that EAGB was undergoing a severe cash flow crisis.

Original sector

Energy

Location

Country

Guinea-Bissau

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Power Generation (CCGT), Government, Power Transmission

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project