ELECTRICITY & HEAT SUPPLY TRANSITION POTSDAM
Under appraisal · Germany
Source: European Investment Bank (EIB)
The project concerns a part of the promoter's multi-annual investment programme in electricity distribution and district heating networks and heat generation over a five-year period. The programme components for the electricity network include refurbishment and extension of existing low-, medium- and high-voltage infrastructure to improve the safety, reliability and quality of service, to replace
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Geothermal
- Location
- Germany
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about ELECTRICITY & HEAT SUPPLY TRANSITION POTSDAM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under appraisal |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project concerns a part of the promoter's multi-annual investment programme in electricity distribution and district heating networks and heat generation over a five-year period. The programme components for the electricity network include refurbishment and extension of existing low-, medium- and high-voltage infrastructure to improve the safety, reliability and quality of service, to replace obsolete hardware as well as to enable connections of new system users. The district heating components entail construction of new heat generation capacities (geothermal heat source with heat pumps) as well as renovating and extending the network by refurbishment of existing network infrastructure and construction of new pipelines, substations and client connections. The district heating investments will improve operations, connecting new users, ensuring security of supply and increase the share of renewable energy heat generation (to comply with EEG requirements). |
Original sector | Energy |
Location
Country | Germany |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Geothermal |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
