Electricity Distribution and Transmission Improvement Project
One of 10,000+ projects Taiyo tracks in Pakistan.
Source: World Bank Group
The objectives of the Electricity Distribution and Transmission Improvement Project for Pakistan are to: (i) strengthen the capacity of the distribution and transmission networks to meet increasing electricity demand in the selected areas more efficiently and with better reliability and quality; and (ii) strengthen institutional capacity of the selected distribution companies and support other pri
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Pakistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Electricity Distribution and Transmission Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Electricity Distribution and Transmission Improvement Project for Pakistan are to: (i) strengthen the capacity of the distribution and transmission networks to meet increasing electricity demand in the selected areas more efficiently and with better reliability and quality; and (ii) strengthen institutional capacity of the selected distribution companies and support other priority areas of the power sector reform. The project includes the following components: (i) physical strengthening of distribution networks operated by four distribution companies (Hyderabad Electric Supply Company (HESCO), Islamabad Electric Supply Company (IESCO), Lahore Electric Supply Company (LESCO), and Multan Electric Power Supply Company (MEPCO); (ii) removing some bottlenecks in the transmission grid, operated by National Transmission and Dispatch Company (NTDC); (iii) technical assistance for capacity building, specialized studies, energy efficiency, and sector reform; and (iv) a pilot energy efficiency program, involving installation of energy saving equipment at the customer level. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Pakistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
