logo

Electricity Distribution and Transmission Improvement Project

Sector: Power Generation (CCGT) • Location: Pakistan

Source: World Bank Group

Project
Closed

The objectives of the Electricity Distribution and Transmission Improvement Project for Pakistan are to: (i) strengthen the capacity of the distribution and transmission networks to meet increasing electricity demand in the selected areas more efficiently and with better reliability and quality; and (ii) strengthen institutional capacity of the selected distribution companies and support other pri

Project Information FAQ

Project Information

5 Q
The project “Electricity Distribution and Transmission Improvement Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Electricity Distribution and Transmission Improvement Project for Pakistan are to: (i) strengthen the capacity of the distribution and transmission networks to meet increasing electricity demand in the selected areas more efficiently and with better reliability and quality; and (ii) strengthen institutional capacity of the selected distribution companies and support other priority areas of the power sector reform. The project includes the following components: (i) physical strengthening of distribution networks operated by four distribution companies (Hyderabad Electric Supply Company (HESCO), Islamabad Electric Supply Company (IESCO), Lahore Electric Supply Company (LESCO), and Multan Electric Power Supply Company (MEPCO); (ii) removing some bottlenecks in the transmission grid, operated by National Transmission and Dispatch Company (NTDC); (iii) technical assistance for capacity building, specialized studies, energy efficiency, and sector reform; and (iv) a pilot energy efficiency program, involving installation of energy saving equipment at the customer level.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data