Electricity Transmission Expansion and Supply Improvement Project
Closed · Nepal
Source: Asian Development Bank (ADB)
The project will improve the reliability of energy supply in Nepal and strengthen the transmission infrastructure needed to promote Nepal's capacity for cross-border energy trade. It will provide support in three critical areas in the electricity supply industry, which has experienced severe underinvestment: (i) electricity transmission capacity expansion, (ii) strengthening of distribution system
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Government, Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Electricity Transmission Expansion and Supply Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will improve the reliability of energy supply in Nepal and strengthen the transmission infrastructure needed to promote Nepal's capacity for cross-border energy trade. It will provide support in three critical areas in the electricity supply industry, which has experienced severe underinvestment: (i) electricity transmission capacity expansion, (ii) strengthening of distribution systems including those along the Tamakoshi (Khimti)-Kathmandu transmission line, and (iii) rehabilitation of selected small hydropower plants. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Raw Materials, Power Generation (CCGT), Commercial, Government, Hydro |
Article published date | 2024-12-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
