Electricity Transmission Network Improvement Project

Closed · Armenia

Source: World Bank Group

The project development objectives for the Electricity Transmission Network Improvement Project for Armenia are to improve the reliability of the power transmission network and system management, and support the Borrower's efforts in ensuring adequate electricity supply. The project is broken up into the following three components: (a) strengthening of the power transmission network; (b) improveme

Status
Closed
Sector
Power Transmission, Wind, Geothermal, Power Generation (CCGT), Government
Location
Armenia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Electricity Transmission Network Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Electricity Transmission Network Improvement Project” is an infrastructure initiative in the Power Transmission sector, located in Armenia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project development objectives for the Electricity Transmission Network Improvement Project for Armenia are to improve the reliability of the power transmission network and system management, and support the Borrower's efforts in ensuring adequate electricity supply. The project is broken up into the following three components: (a) strengthening of the power transmission network; (b) improvement of the power system management; and (c) preparation of a new electricity generation project. Component A includes five subcomponents designed to achieve the following: i) rehabilitation of Ashnak substation of High Voltage Electric Networks (HVEN) to help reduce the number of equipment failures, ii) rehabilitation of Yerevan Thermal Power Center (YTPC’s) substation, iii) purchase of machinery and equipment for maintenance of the power transmission network, iv) project implementation support to HVEN, and v) Project implementation support to YTPC. Component B, improvement of the power system management, will finance the establishment of a back-up dispatch center, which will contribute to improvement of the power system management. Specifically, it is important for ensuring continuous management and control of the power system in case the primary dispatch center fails due to technical or other reasons. Component C, preparation of a new electricity generation project, has two subcomponents: i) the preparation of a new Combined Cycle Gas Turbine (CCGT) project. The new CCGT project is part of the Government’s least-cost power supply plan until 2030 and ii) a project audit.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Armenia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Wind, Geothermal, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project