Electricity Transmission Rehabilitation Project
Sector: Power Transmission • Location: Kazakhstan
Source: World Bank Group
The Electricity Transmission Rehabilitation Project aims to improve the reliability and quality of electricity supply; develop competition; and restructure the Kazakhstan Grid Operating Company so that it is financially viable. The project has four main components. The first refurbishes transmission substations, including replacement of high voltage equipment at substations; installs shunt reactor
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Electricity Transmission Rehabilitation Project aims to improve the reliability and quality of electricity supply; develop competition; and restructure the Kazakhstan Grid Operating Company so that it is financially viable. The project has four main components. The first refurbishes transmission substations, including replacement of high voltage equipment at substations; installs shunt reactors to compensate for reactive power; replaces protective relaying, and supplies and installs monitoring and control equipment at substations. The second component modernizes the dispatch control system, including supply and installation of a supervisory control and data acquisition system at regional and national dispatch centers; reinforces a telecommunications system; and supplies and installs a commercial metering system. The third component finances institutional development, which includes installing a company-wide management information system and corporate restructuring. The fourth component provides technical assistance for procurement and project management, and establishes an electricity spot market. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
