logo

Electrification of North-Western Tanzania Project

Sector: Hydro • Location: Tanzania

Source: European Union Africa Infrastructure Trust Fund

Project
Under Disbursement

The project comprises the construction of a new 140 km 220 kV transmission line from Geita to Nyakanazi in North-Western Tanzania, the extension and construction of the respective substations, rural electrification in the vicinity of the transmission line and substations, and associated consulting services. The project will provide electricity in a region that is currently not connected to the nat

Project Information FAQ

Project Information

4 Q
The project “Electrification of North-Western Tanzania Project” is an infrastructure initiative in the Hydro sector, located in Tanzania. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under disbursement

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction of a new 140 km 220 kV transmission line from Geita to Nyakanazi in North-Western Tanzania, the extension and construction of the respective substations, rural electrification in the vicinity of the transmission line and substations, and associated consulting services. The project will provide electricity in a region that is currently not connected to the national grid and at the same time displays significant economic potential in agriculture and mining. The interconnection of hydropower resources (Rusumo Falls) to the national grid will ensure a cheap and sustainable power supply in the region replacing costly diesel generation. Project implementation began in 2015 and is scheduled to be finalized end-2020.  The project is jointly financed by KfW - on behalf of the German Ministry for Economic Cooperation and Development (BMZ), AFD (Agence Française de Développement) and the EU-AITF. The rural electrification component financed by the EU-AITF is a prerequisite to enhance access for households, small- and medium-sized businesses and social institutions to sustainable, reliable and affordable energy services for productive and consumptive use in a region currently not connected to the national grid. This can act as a catalyst to stimulate socio-economic development, employment creation and improved social service delivery. The reduced reliance on fuel wood for lighting and use of diesel will decrease deforestation pressures and CO2 emissions with positive climate effects and significant cost savings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data