ELECTRIFICATION ZABREH - SUMPERK
One of 3,391 projects Taiyo tracks in Czechia.
Source: European Investment Bank (EIB)
The project consists of the renewal and electrification of the 13.46 km long single-track line between Zabreh and Sumperk. The project aims to integrate the railway line more closely into the regional network around Olomouc. The line speed is increased from 70 - 80 km/h to a maximum of 100 km/h. The loading capacity of the tracks is increased from UIC category D3 to category D4, which is common th
- Status
- Prospective
- Sector
- Mass Transit, Rail, Commercial, Government
- Location
- Czech Republic
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about ELECTRIFICATION ZABREH - SUMPERK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of the renewal and electrification of the 13.46 km long single-track line between Zabreh and Sumperk. The project aims to integrate the railway line more closely into the regional network around Olomouc. The line speed is increased from 70 - 80 km/h to a maximum of 100 km/h. The loading capacity of the tracks is increased from UIC category D3 to category D4, which is common throughout much of Europe and allows for 22.5t/axle. |
Original sector | Transport |
Location
Country | Czech Republic |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Commercial, Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Czechia
- Reconstruction of railway. Prerov 2nd construction
- Modernization of Rokycany - Pilsen (2nd phase)
- Optimization of the line Praha-Smichov (outside)-Cernosice (outside)
- Improvement of the capacity and technical parameters of the railway connection between the South Moravian and Lower Austrian regions.
- Pilsen junction, 2nd construction - reconstruction of the individual railway station, including the Mikulasska bridges
- D1 Modernization - Section 02, Exit 21 Mirosovice - Exit 29 Hvezdonice
- Mikulov, Portz Island — development and renewal of the composed historical landscape
- Policy Learning in Information Technologies for Public Transport Enhancement
