logo

Electrified Double Track Project (EDTP)

Sector: Rail • Location: Malaysia

Source: Gamuda Berhad

Project
Completed

The Electrified Double Track Project (EDTP) spans 329km across northern Malaysia, retrofitting a century-old rail network with modern electrification and signalling systems. It includes two tunnels and seven main stations, setting a new benchmark for rail modernization in the country.

Status
Closed
Sector
Rail, Mass Transit
Location
Malaysia
Updated
22 Jul 2026
Source
Gamuda Berhad

ConstructChat

Ask ConstructChat about Electrified Double Track Project (EDTP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Electrified Double Track Project (EDTP)” is an infrastructure initiative in the Rail sector, located in Malaysia. Taiyo aggregates data on it from Gamuda Berhad.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Electrified Double Track Project (EDTP) spans 329km across northern Malaysia, retrofitting a century-old rail network with modern electrification and signalling systems. It includes two tunnels and seven main stations, setting a new benchmark for rail modernization in the country.

Original sector

Rail Systems

Location

Country

Malaysia

Source

Source

Gamuda Berhad

URL

More Details

Record type

Project

Sector

Rail, Mass Transit

Article published date

2025-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project