Electrified Double Track Project (EDTP)
Sector: Mass Transit • Location: Malaysia
Source: Gamuda Berhad
The Electrified Double Track Project (EDTP) spans 329km across northern Malaysia, retrofitting a century-old rail network with modern electrification and signalling systems. It includes two tunnels and seven main stations, setting a new benchmark for rail modernization in the country.
- Status
- Closed
- Sector
- Mass Transit, Rail
- Location
- Malaysia
- Updated
- 22 Jul 2026
- Source
- Gamuda Berhad
ConstructChat
Ask ConstructChat about Electrified Double Track Project (EDTP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Electrified Double Track Project (EDTP) spans 329km across northern Malaysia, retrofitting a century-old rail network with modern electrification and signalling systems. It includes two tunnels and seven main stations, setting a new benchmark for rail modernization in the country. |
Original sector | Rail Systems |
Location
Country | Malaysia |
Source
Source | Gamuda Berhad |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail |
Article published date | 2025-05-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
