logo
ProjectClosed

ELETROBRAS DISTRIBUT

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

The Eletrobras First Power Distribution Project consists of five subprojects. Each subproject consists of portions of the 1982 to 1986 investment program of the five state utility companies selected by ELETROBRAS as beneficiaries of the proposed loan. These utilities are small to medium size companies located in the less developed regions of Brazil. The objectives of their programs are to meet the

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ELETROBRAS DISTRIBUT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELETROBRAS DISTRIBUT” is an infrastructure initiative in the Power Transmission sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Eletrobras First Power Distribution Project consists of five subprojects. Each subproject consists of portions of the 1982 to 1986 investment program of the five state utility companies selected by ELETROBRAS as beneficiaries of the proposed loan. These utilities are small to medium size companies located in the less developed regions of Brazil. The objectives of their programs are to meet the needs of the market efficiently and to remedy unsatisfactory conditions arising from inadequate planning and lack of sufficient investment during preceeding years. Their programs provide for the purchase and installation of equipment, consultant services and the formulation of plans that give emphasis to the connection of rural and low-income consumers. The project will substantially strengthen the operations of ELETROBRAS, especially its project selection, appraisal and supervision capability. In addition it will provide institutional support and strengthening to the beneficiaries.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project