logo

ELETROBRAS Distribution Rehabilitation

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank

Project
Closed

The development objective of the Eletrobras Distribution Rehabilitation Project for Brazil is to improve the financial and operational performance and the commercial management of the six DisCos (Distribution Companies) by reducing electricity losses, increasing bill collection rates, and improving quality of service. There are two components to the project. The first component of the project is s

Status
Closed
Sector
Power Generation (CCGT), Commercial, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about ELETROBRAS Distribution Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELETROBRAS Distribution Rehabilitation” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Eletrobras Distribution Rehabilitation Project for Brazil is to improve the financial and operational performance and the commercial management of the six DisCos (Distribution Companies) by reducing electricity losses, increasing bill collection rates, and improving quality of service. There are two components to the project. The first component of the project is service quality improvement and loss reduction. This component improve the quality of service, reducing electricity losses and increasing collection rates in electricity distribution and retail through the acquisition of goods, equipment, works and services for the following activities: i) distribution network reinforcement; ii) implementation of Advanced Metering Infrastructure (AMI) and other actions to maximize metered consumption; and iii) modernization of discos Management Information System (MIS). The second component of the project is institutional strengthening. This component strengthens of the operational capacities of the DisCos through the provision of technical assistance, training, consultancy services, studies, equipment, and operational costs in the following areas: i) performance-based management including support to project implementation, monitoring, reporting and evaluation by the project management unit and the six DisCos; ii) management of environmental and social impacts and processes; iii) provision of support to community outreach; and iv) provision of support to selected programs delivered at a sectoral training and research center in the Guarantor's state of Acre.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Brazil

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project