logo

ELETROSUL TRANSMISSI

Sector: Power Transmission • Location: Brazil

Source: World Bank Group

Project
Closed

The project is part of ELETROSUL's program for the expansion of its high voltage transmission system in its concession area in the southern states of Parana, Santa Catarina and Rio Grande do Sul during the period 1980-1984. It includes the high voltage transmission facilities which comprise the third stage expansion of its 500 kV system, and related investments, as follows: (i) transmission lines:

Status
Closed
Sector
Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Government, Residential, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ELETROSUL TRANSMISSI

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ELETROSUL TRANSMISSI” is an infrastructure initiative in the Power Transmission sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is part of ELETROSUL's program for the expansion of its high voltage transmission system in its concession area in the southern states of Parana, Santa Catarina and Rio Grande do Sul during the period 1980-1984. It includes the high voltage transmission facilities which comprise the third stage expansion of its 500 kV system, and related investments, as follows: (i) transmission lines: construction of about 950 circuit-km of lines at 500 kV and about 90 circuit-km of tie lines at 230 kV; (ii) substations: installation of about 1,600 MVA (525/230 kV) of additional transformer capacity in four new and in the expansion of seven existing substations, and about 1,000 MVRA (525 kV) in reactors and other substation apparatus; (iii) auxiliary facilities: installation of carrier-wave communications equipment for project lines and procurement of additional computer equipment for central office data processing; and (iv) consultants' services and training: (a) about 35 staff-months of consultants' services for high voltage system planning and design and for final designs of the Ilha Grande hydroelectric project; (b) on-the-job training in equipment fabrication supervision outside Brazil (about 105 staff-months), and in high voltage system planning and operation.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Government, Residential, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project