Elevated Storage Tank Construction
Sector: Water Supply and Storage • Location: Sumter, South Carolina, United States of America
Source: Dodge USA
The work to be done consists of furnishing all materials, equipment and labor necessary to construct a New 500,000-Gallon Elevated Storage Tank for the City of Sumter, consisting of the following approximate quantities: A 0.5 MG elevated water tank (multi-column or composite), approximately 958 LF of 12-inch water main, valves, fittings, and appurtenances, demolition and installation of two (2) al
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work to be done consists of furnishing all materials, equipment and labor necessary to construct a New 500,000-Gallon Elevated Storage Tank for the City of Sumter, consisting of the following approximate quantities: A 0.5 MG elevated water tank (multi-column or composite), approximately 958 LF of 12-inch water main, valves, fittings, and appurtenances, demolition and installation of two (2) altitude valves (off-site), and installation of an emergency generator (off-site). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
